EIA for power plant combined cycle in Buzi – Sofala

The Combined Cycle Plant will be built in two independent and identical blocks, each consisting of two gas turbines with a unit capacity of 50 MW ISO, two recovery heat boilers, and a steam turbine. The power supply to the national grid will be made through a 220 kV substation and a transmission line of about 90 km long, from the central to the delivery point, the existing EDM substation at Inchope.


Place: Mozambique
Client: Biondinamica on behalf of CTB, Lda
Date: 2015 – 2017